Bangladesh Industrial Solar & Future Energy Calculator
SREDA Net-Metering Aligned
Bangladesh Industrial Solar & Future Power Calculator
Simulate rooftop solar power savings, ROI, grid inflation protection, and carbon offset tailored for Bangladeshi industries.
National Target
40% Clean Energy by 2041
Facility Parameters
High roof area to load ratio, ideal for maximum solar coverage.
120,000 kWh
10k kWh
500k kWh
1M kWh
৳ 10.85
৳8.00
৳10.85 (Avg Industrial)
৳18.00
50,000 sq ft
Approx. 100 sq ft is needed per 1 kWp of solar capacity.
Bangladesh Net-Metering Rules (SREDA)
- Maximum allowable solar capacity: Up to 70% of sanctioned transformer load.
- Surplus electricity exported to the national grid is credited against imported grid energy at the end of billing cycles.
- Import duty incentives & zero tariff on primary solar components apply.
Rec. System Size
500
kWp
Roof limited
ROI / Payback
4.2
Years
Capex ~৳3.25 Cr
Net Savings
৳
14.8
Cr
Over 20 Years
Cost Offset
42%
Of monthly bill
Estimated Monthly Energy Spend (Year 1 vs Future Year 20)
100% Grid Dependent (No Solar)
Year 1: ৳13.0 Lac
Yr 20: ৳50.3 Lac/mo
With Solar System Installed
Year 1: ৳7.5 Lac
Yr 20: ৳29.1 Lac/mo
Cumulative Expenditure Projection
In BDT CroreFacility Energy Mix
Solar Generation:
50,000 kWh/mo
Environmental Impact Offset
Annual Sustainability Metrics
Replacing grid energy with clean rooftop solar power directly supports ESG goals.
360
Tons CO₂ / year
16,360
Trees equivalent